Jiangsu Weigu fluid introduction: What are the starting steps of Roots blower?

 2024-04-29

Jiangsu Weigu fluid introduction: What are the starting steps of Roots blower?


Roots blower start 9 steps, be sure to look carefully!

Many Roots blower customers are the first time to use this kind of equipment, and some are the first time to contact the equipment, and then began to study the use of such equipment, we have received many customers, for Roots blower start-up is not very understanding, although Sanniu fan updated such articles, but there will still be users to consult our customer service, asking about Roots fan start-up problems, Today, Jiangsu Weigu Fluid - Roots fan manufacturer will sort out the 9 steps of Roots blower startup for you, and according to these 9 steps, Roots blower can be correctly started.

Roots blower should make the following preparations before starting up;

1, fully open the intake control valve, outlet control valve and by-pass pipe;

2. Check whether the air inlet filter is smooth and whether the inlet of the filter is fully opened;

3. Check whether the support of pipes, valves, mufflers and air filters is stable, and no load force should be added to the housing;

4, check whether the lubricating oil is good, the model is suitable, the depth of the lubricating oil layer should reach 3 to 5 cm above the specified oil line, and the cooling water system is smooth;

5, flip the coupling, check whether the impeller transfer is suitable, there is no friction collision;

6. Check whether the connection of each part is good and whether it is loose;

7, remove the surrounding debris, keep the fan within two meters of no debris;

8. Check whether the electrical part and the buck starting equipment are in good condition;

9, check whether the maintenance tools are complete, fire extinguishing equipment is sufficient and complete.

Steps: When starting Roots fan, we first open the vent valve, and then start the motor to check the air intake of Roots fan. After the fan works for a few minutes, adjust the outlet, and then slowly close the vent valve. At this time, it is necessary to check the working condition of each instrument, and there should be no overpressure and overflow.